← aiconver Industries
AI for Tenders · Engineering, Environmental & Permitting Services

Win more VgV tenders — without the evidence marathon.

Qualification evidence, reference projects, staff qualifications: VgV procedures are decided by completeness, not by the most beautiful concept. The AI Concierge evaluates the tender, fills mandatory fields from your references and qualifications and suggests the bidder questions that matter.

up to 80% less form-filling effort8 hrs → 45 minGDPR · Servers in Germany
The problem

Why VgV bids fail even though the qualification is there

It’s not capability that decides — it’s evidence, formalities and the clock.

×24

Qualification & reference evidence

Finding the matching reference and qualification for every criterion — starting from scratch with every tender.

Formal error = exclusion

One missing document, one missed formal deadline — and the bid is out before the substantive evaluation.

3 drives, 10 folders

Knowledge scattered

Project references, certificates and qualification evidence are spread across drives and people’s heads.

How it works

From tender to submission — in four steps

One continuous workflow, designed specifically for planning, engineering and permitting services (VgV).

01 Managecentral & searchable02 EvaluateGo/no-go score?03 Bidder questionsClarify suitability04 Win80% of fields filled
1

Manage

All tenders, reference projects and qualification evidence centralised and semantically searchable — no loss of knowledge.

2

Evaluate

Do suitability and references match the procedure? Success-probability score based on criteria, reference fit and capacity — in minutes.

3

Bidder questions

Unclear suitability criteria and contradictions are detected and phrased as a question that is clean under procurement law.

4

Win

Up to 80% of mandatory fields filled automatically from references and qualification evidence — with source.

8 hours of effort → 45 minutes. Error rate 15–20% → under 2%.

Why a dedicated AI

Not just any AI — one that understands permitting and engineering services.

A generic language model reads a suitability criterion like running text. Our industry AI knows the difference between permit management, plant safety & fire protection and planning & architecture — and knows which reference satisfies a criterion. Trained per industry, on German infrastructure.

What aiconver delivers

The key features for planning & expert-report tenders

Evidence processing

Suitability criteria and reference requirements read in and mapped in a structured way.

Success-probability score

Go/no-go evaluation based on suitability, reference fit and capacity — in minutes.

Bidder questions

Detects unclear suitability criteria and contradictions — and formulates the clarification question.

Filling in with source

Mandatory fields from references and qualification evidence — verifiable, not guessed.

The difference

VgV tenders today vs. with AI Concierge

Step Manual today With AI Concierge
Mapping qualification & reference evidence Hours automatic
go/no-go assessment Gut feeling Score in minutes
Bidder questions on suitability criteria often too late suggested
Mandatory fields & evidence Copy-paste 80% automatic
Time spent per tender 8 hours 45 minutes
Error rate 15–20 % < 2%
FAQ

What planning & engineering firms ask first

Yes. The tender documents are read in in a structured way, suitability criteria and reference requirements are recognised and mapped to matching evidence — as a basis for evaluation, bidder questions and form filling.

From your own company knowledge — project references, qualification evidence, certificates, previous bids. Every answer comes with a source reference; if information is missing, it is flagged rather than guessed.

The AI Concierge prepares and suggests — review and submission remain with your team. Bidder questions are phrased so that you only need to check and send them.

All data is processed exclusively on servers in Germany (ISO 27001, GDPR-compliant). No disclosure to external AI providers, no training on your data.

A pilot starts within a few days. First measurable results are usually visible after two to four weeks — with a German team that supports you through onboarding.

Never lose a VgV tender over a missing document again.

In 9 minutes we’ll walk through a real tender from your field — success-probability score, bidder questions and completed fields on a live example.

Check a tender live – 9 min., free of charge